Skip Navigation Links
About UsExpand About Us
WRLDC F&C
WRLDC Meter Program
Weather Website
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
RTI 2005
Contact Us
Skip Navigation Links
Home
RealTime DataExpand RealTime Data
WBES SchedulingExpand WBES Scheduling
Scheduling(Upto 31/07/16)Expand Scheduling(Upto 31/07/16)
Transfer CapabilityExpand Transfer Capability
राजभाषा
POC
REC Mechanism
Open AccessExpand Open Access
CommercialExpand Commercial
ReportsExpand Reports
New Element Integration
Latest Telemetry Status
Useful LinksExpand Useful Links
Disaster ManagementExpand Disaster Management
Workshop
Disclaimer

Intranet on Local

Internship at WRLDC(POSOCO)

   हिंदी वेबसाइट

  Visitor No:
 free counter







ROLE OF SLDCs...
 

In accordance with section 32 of Electricity Act, 2003 roles and functions of SLDCs are as under:

i) The SLDCs shall be the Apex Body to ensure integrated operation of the power system in a State.

ii) SLDCs shall :

a) be responsible for optimum scheduling and despatch of electricity within a State in accordance with the contracts entered into with the licensees or the generating Companies operating in that State.

b) monitor grid operation.

c) keep accounts of the quantity of electricity transmitted through State grid.

d) exercise supervision and control over the inter-State transmission system.

e) be responsible for carrying out real time operation for grid control and despatch of electricity within the State through secure and economic operation of the State Grid in accordance with the Grid standards and State Grid Code.

SLDCs in the Northern Region are performing the following functions.

· Overall supervision, monitoring and control of the integrated power system in the State on real time basis for ensuring stability, security and economy operation of the power system in the State.

· Optimum scheduling and dispatch of electricity within the State. For this SLDCs estimate the demand of the State / DISCOMS, as may be the case, availability of power in the State/DISCOMS from State generators and other sources like Central Generating stations, bilateral contracts etc, conveys the final requisition to RLDCs on the State’s entitlement from the Central Generating Stations and bilateral transactions under open access, if any, and issues final dispatch schedule to the State Generators and drawal schedule to the DISCOMS.